● A temporary URL-replacement script has been put into place so that UC IPM images that are still on the HTTP server can be viewed while Chinh gets a proxy set up to support HTTPS. ( Note there are still some images that are being blocked by browser security occasionally in our data, such as those that are being directed to a UC Davis server. We have also put in a “Missing Image” placeholder that appears when this happens. ) ● UC IPM’s feedback on the test set has been integrated into our evaluation cycles. ● Since our last report, numerous iterations were completed on the backend, represented by the following gains in our performance metrics.
Baseline Metrics for Valid Responses Top 1 result - 33% Top 3 results - 40%
Top 5 results - 44%
Top 10 results - 53%
Recall for NA - 67%
Metrics as of June 22 Top 1 results - 36%
Top 3 results - 63%
Top 5 results - 67%
Top 10 results - 74%
Recall for NA - 79%
● Web Hosting continues to be an important aspect of NTAE/Extension for managing access to content through technology. ○ Currently hosting 95 websites. Continuing to monitor sites for routine issues along with maintaining uptime. With Ben's (web engineer) departure we created a job description for a WordPress Support contractor and received quotes from three different firms. We decided to go with Belay based on their emphasis on making sure we would get a single individual that would be fully vetted and would do both the website maintenance on the existing websites. ○ Significant Results: ■ All applicable sites have been updated with GDPR compliance plugin deployment and a new Web Developer Contract is in place. ○ Anticipated work for the next reporting period (Year 4 September 1, 202 - November 30, 2022): ■ Our new contractor should start soon with a priority of beginning to update WordPress sites from PHP 7 to PHP 8 along with other general maintenance tasks.
7
Powered by FlippingBook